All projects

Completed project

Spa primary bathroom

Hampstead, NC

A primary bathroom rebuilt as a tiled spa, with a freestanding tub, custom vanity, and a walk-in shower.

The transformation

Before and after

Spa primary bathroom before remodeling
Before
Spa primary bathroom after remodeling
After

About the project

A wet room built for daily use

This primary bathroom was opened into a tiled spa. The garden tub and dated surround came out so a freestanding tub could sit in a walk-in shower with floor-to-ceiling tile.

Warm wood cabinetry, stone surfaces, and brass fixtures give the room a calmer finish without losing the storage a primary bath needs.

Tile, waterproofing, and careful layout

Vertical tile, a linear shower, and a clear path from vanity to bath keep the space easy to use. The work behind the surfaces is what makes a wet room last.

Learn about our bathroom remodeling service or start your project inquiry.